Home |
Search |
Today's Posts |
#8
![]() |
|||
|
|||
![]()
Ralph, was the 21 foot tube you used steel or alloy?
"Ralph Mowery" wrote in message ... "Barrett" wrote in message o.uk... I have one last question. I an using a home made tilt over mast made up of aluminium scaffold tube ( 2" OD heavy duty) and the same tube for the stub mast. I have two heavy duty brackets made up that clamp onto the scaffold tube to hold the rotator and support bearing in place. What would be a good average distance to have between the brackets that hold the rotator and bearing? Thanks I don't have any idea. I just put my rotator mounting plate where it fit the bracing in the tower. That put about 5 or 6 feet of a 21 foot piece of 2 inch OD ( 1 1/2 trade size of galvinised pipe. I just based that on where the plate fit and having enough pipe in the tower were I can pull the rotator out if it needs repair. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Beams FS | Swap | |||
Beams FS | Antenna | |||
Two Element Beams | Antenna | |||
Mini Beams | Antenna | |||
beams | Antenna |