--------------010207050005070101080006
Content-Type: text/plain; charset=us-ascii; format=flowed
Content-Transfer-Encoding: 7bit
I'm old enough to remember. At the class 1B clear channel station I
worked at our 10 kw auxiliary transmitter had a bunch of components that
had to be jumpered and/or added. We would test it into the dummy load
after we set it up on 1240. There was a large manual denoting the
changes that had to be made. There was also an area test where we would
get an alert from the Conelrad control point and we would have to set
the aux to 1240 and turn its control over the the control point and then
they would test for a half hour or so. On for 30-60 seconds and off for
3-4 minutes in a random pattern. I think this was the only exception to
the union contract that we could do anything except take meter readings
without a supervisor there. Of course we took about 100 meter readings
and then typed them into the official log every 1/2 hour.
Later at a EBS (what was it now CSPS??-1) main station we had a 35 kw
generator and 1500 gallons of diesel fuel, console, turntable, cart
machines, tape machines and at least 30 days of food at the transmitter
with walls 24 inches thick (8" block, 8" reinforced concrete, 8" block
sealed and air conditioned. We also had two way radios between us and
the State Police and the local County Sheriff/FEMA office. FCC (for
FEMA I believe) came out every so often to check out our EBS readiness.
Even the food and the other ends of the two way radios to be sure the
links worked. Everything was also (supposedly) protected from EMP.
I asked one day how much notice we would have to man the site in the
event of an attack and was told about 15 minutes and I said "Oh good!
It takes me 20 minutes to get there from the studios in an emergency".
The FEMA guy just shook his head and smiled.....
Rich Wood wrote:
On 21 Aug 2003 02:54:39 GMT, (John Byrns) wrote:
In article , (Gene Seibel) wrote:
The only requirements I know of were back in the days of conelrad.
Nothing now.
Do you remember what the specific requirements were back in the days of
conelrad?
In the 60 and 70s every transmitter I worked with had a crystal for
either 640 or 1240. As I recall there were serious requirements to be
part of the system. I think they were an underground studio, generator
at both studio and transmitter and a connection to a local, regional
or federal emergency feed to, I think, Civil Defense.
I don't remember what the testing procedure was because everyone would
have had to switch to their assigned emergency frequency. I'm just not
old enough to remember.
Rich
--------------010207050005070101080006
Content-Type: text/html; charset=us-ascii
Content-Transfer-Encoding: 7bit
!DOCTYPE html PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN"
html
head
meta http-equiv="Content-Type" content="text/html;charset=ISO-8859-1"
title/title
/head
body
I'm old enough to remember. At the class 1B clear channel station
I worked at our 10 kw auxiliary transmitter had a bunch of components that
had to be jumpered and/or added. We would test it into the dummy load after
we set it up on 1240. There was a large manual denoting the changes that
had to be made. There was also an area test where we would get an alert
from the Conelrad control point and we would have to set the aux to 1240
and turn its control over the the control point and then they would test
for a half hour or so. On for 30-60 seconds and off for 3-4 minutes in a
random pattern. I think this was the only exception to the union contract
that we could do anything except take meter readings without a supervisor
there. Of course we took about 100 meter readings and then typed them into
the official log every 1/2 hour.br
br
Later at a EBS (what was it now CSPS??-1) main station we had a 35 kw generator
and 1500 gallons of diesel fuel, console, turntable, cart machines, tape machines
and at least 30 days of food at the transmitter with walls 24 inches thick
(8" block, 8" reinforced concrete, 8" block sealed and air conditioned. We
also had two way radios between us and the State Police and the local County
Sheriff/FEMA office. FCC (for FEMA I believe) came out every so often to
check out our EBS readiness. Even the food and the other ends of the two
way radios to be sure the links worked. Everything was also (supposedly)
protected from EMP. br
br
I asked one day how much notice we would have to man the site in the event
of an attack and was told about 15 minutes and I said "Oh good! It takes
me 20 minutes to get there from the studios in an emergency". The FEMA guy
just shook his head and smiled.....br
br
br
Rich Wood wrote:br
blockquote type="cite" "
pre wrap=""On 21 Aug 2003 02:54:39 GMT, a class="moz-txt-link-abbreviated" /a (John Byrns) wrote:
/pre
blockquote type="cite"
pre wrap=""In article a class="moz-txt-link-rfc2396E" "<bi0u9 >/a, a class="moz-txt-link-abbreviated" /a (Gene Seibel) wrote:
/pre
blockquote type="cite"
pre wrap=""The only requirements I know of were back in the days of conelrad.
Nothing now.
/pre
/blockquote
pre wrap=""Do you remember what the specific requirements were back in the days of
conelrad?
/pre
/blockquote
pre wrap=""!----
In the 60 and 70s every transmitter I worked with had a crystal for
either 640 or 1240. As I recall there were serious requirements to be
part of the system. I think they were an underground studio, generator
at both studio and transmitter and a connection to a local, regional
or federal emergency feed to, I think, Civil Defense.
I don't remember what the testing procedure was because everyone would
have had to switch to their assigned emergency frequency. I'm just not
old enough to remember.
Rich
/pre
/blockquote
br
/body
/html
--------------010207050005070101080006--