View Single Post
  #138   Report Post  
Old July 29th 03, 05:04 AM
D. Stussy
 
Posts: n/a
Default

On Mon, 28 Jul 2003, Alun Palmer wrote:
"Phil Kane" wrote in
.net:

On 26 Jul 2003 04:49:22 GMT, Alun Palmer wrote:

OK Phil, read 97.301(e) and let us know how you understand it, parsing
each part carefully.


OK - I presume that you mean the following text, not the frequency
table:

(e) For a station having a control operator who has been
granted an operator license of Novice Class or Technician Class

This is self-explanatory.

and who has received credit for proficiency in telegraphy in
accordance with the international requirements.

The key to this discussion is, or course, "what are the
international requirements".


Agreed


Up until the 2003 revision of S25.5 of the IRR, each Administration
was required to determine the proficiency of each applicant for a
license valid for operation below 30 MHz. In the US, this was done
by requiring the applicant to pass Element 1.

Upon the 2003 revision of S25.5 of the IRR, the requirement to
determine proficiency was made optional for each Administration.

That is the only change in the "international requirement" - each
Administration can now decide by its own rules/regulations whether
to require a code test. The code test is no longer mandatory for
each Administration. Each Administration's requirement for code
testing has not been automatically "dropped" or "eliminated" solely
by the revision of S25.5.


So far, so good

Until the FCC changes the rules concering Element 1, the
requirement in the US remains that Element 1 must be passed.


That's not what 301(e) says, though, is it?

The problem I have in your analysis is that 301(e) itself is one of the
rules concerning element 1. It mentions Element 1 per se nowhere, but
there is no other rule tying Technician HF privileges to Element 1.

This last statement of yours is indisputable re the General and Extra, in
that Element 1 is still required to obtain those licences. However, there
is nowhere in Part 97 any statement that a Technician needs Element 1 for
anything, instead there is only the wording in 97.301(e).

The question of -when- and -how- the FCC Rules will be changed is a
separate item from -what- the rule requirement is up until they
-are- changed.


Agreed

Ditto for how the FCC will handle the issue of
giving -what- privileges to folks who hold a Technician license
but have never passed the code test.

Does that answer your question?

--
73 de K2ASP - Phil Kane
ARRL Volunteer Counsel

From a Clearing in the Silicon Forest
Beaverton (Washington County) Oregon




Not really. The question comes down to the meaning of "and who has
received credit for proficiency in telegraphy in accordance with the
international requirements". If there is no international requirement to
have "received credit for proficiency in telegraphy" for access to any
frequency, then a person who has not "received credit for proficiency in
telegraphy" is "in accordance with the international requirements" if they
operate on those frequencies.

Can we deem that a Tech who has not "received credit for proficiency in
telegraphy" has nevertheless "received credit for proficiency in
accordance with the international requirements", i.e. is "in accordance
with the international requirements"?


I've taken exactly the opposite approach: IF there is no international
requirement (it's now OPTIONAL), then how can one show compliance with a
requirement that itself no longer exists? My answer is that one CANNOT be in
compliance with a non-existant requirement, and thus HF privileges defined in
..301(e) have been STRIPPED effective July 5, 2003 from those who previously
held them, not granted to those who didn't have them.

Granted that s25.5 as revised allows each administration to determine
whether a code test is required. That being the case, the FCC does so in
respect of Tech HF operation only through 97.301(e) and in no other rule.
If that rule is conditional upon a code test being required by
international requirements, then there is nothing therein indicating that
the FCC chooses to require a code test for that particular purpose.


Having a choice (regardless of whom holds the choice) means that it is an
OPTION, and options aren't requirements. A requirement means that there is no
choice; no option. These are OPPOSITES.

To cut a long story short, the argument rests upon whether "in accordance
with international requirements" is a necessary condition in the sentence.
If it is, then no-code Techs have the Novice HF frequencies*, and if not,
then they will have to wait. This is really what I am seeking comment on,
although all other observations are welcome.


What novice HF bands? Novice licenseholders are likewise affected despite the
fact that their licenses DO include element 1 credit, because that credit has
no bearing on the ability to use those bands. If element 1 were an important
fact, then 47 CFR 97.301(e) would have been written that way instead of making
reference to the "international requirement" [that no longer exists.]

*(Although possibly not until after ratification of the new treaty)


Ratification won't make a difference here. Rejection of the treaty might!