His house inverter construction takes the prize for labor
http://www.schmitzhouse.com/Johns_Electronics_02.htm
Good lord..
Greg
http://www.schmitzhouse.com/Johns_Electronics_03.htm
nice pix. I'll need to do some cleanup before I can start in earnest, it
used to be a rental, and the last tennant left "under duress". Still, it
appraises for 20% more than I'm paying.

I've been in a large bedroom for about 8 years now, but the bedroom seems to
have shrunk over time. That, and I air condition 10 months out of the year,
due to the surplus of electric heat from the equipment.
I'm thinking in terms of a 6" pvc into the attic, some of the cables I need
to pull thru are nearly an inch in diameter.
I wish I had some from my early days projects, but that would have been kind
of a bad idea... Not to mention disallowed in many cases.. The last one I
did professionally, was the office of the commander in chief, pacific fleet.
Fun doing wiring with an armed marine behind you all day.
There was a time that I put 600 phone lines into a residential basement in
wisconsin.