grounding
I am installing a short tower. The soil is very dry, mostly volcanic ash
and low conductivity. I had the backhoe operator dirll several holes 4
feet deep for grounding. It is impossible to drive a ground rod deeper
than 4 feet due to bedrock. What should I use to fill the holes after
the ground rods are installed?
|