Boom construction
Tom Ring wrote in
:
....
the next hole. Move the device to the latest hole drilled as you run
out of table. To reduce errors from imperfect vertical on the device,
This violates an important technique of minimising measurement and layout
error, determine a datum such that you can lay everything off from that
datum, and then do just that.
the next hole. Move the device to the latest hole drilled as you run
out of table. To reduce errors from imperfect vertical on the device,
rotate it 180 degrees between each move.
This is a technique to compensate for moving the datum.
I am not saying it won't work, and I can see that you have done it to reduce
the size of accurate table needed to register the device.
Owen
|