LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #20   Report Post  
Old September 8th 04, 06:56 PM
Ian White, G3SEK
 
Posts: n/a
Default

Richard Harrison wrote:

My electric company, the former Houston Lighting and Power Company,
writes:
"All services shall be properly grounded. Note - NEC requires grounding
to a "metallic underground water piping system" if available. Acceptable
alternatives include a driven ground rod which is preferred by HL&P Co.
regardless of the type grounding electrode used. NEC requires that the
"interior cold water pipimg system" be bonded to it."


That last point is the same in the UK. Gas and water supplies are never
relied on to provide an electrical ground, but they must be bonded to
the electrical supply ground.

Additional local bonding is also required for all metalwork in bathrooms
and shower rooms.


--
73 from Ian G3SEK 'In Practice' columnist for RadCom (RSGB)
http://www.ifwtech.co.uk/g3sek


 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
CD Player Receives FM Station None None Antenna 1 July 14th 04 03:28 AM
Newbie - Studying for Tech & planning station setup - Vertical antennaquestion Volker Kerkhoff Antenna 4 January 17th 04 07:47 PM
Antenna mast grounding question Mike Ekholm Antenna 25 December 5th 03 07:26 AM
Grounding for Vertical Question Mike Coslo Antenna 1 November 29th 03 07:36 PM
Grounding question - this is wierd..... John Passaneau Antenna 17 August 31st 03 06:42 AM


All times are GMT +1. The time now is 08:46 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 RadioBanter.
The comments are property of their posters.
 

About Us

"It's about Radio"

 

Copyright © 2017