LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #10   Report Post  
Old September 5th 18, 09:11 PM posted to uk.radio.amateur,rec.radio.amateur.antenna
external usenet poster
 
First recorded activity by RadioBanter: Mar 2017
Posts: 209
Default Earth Rods?

On 05/09/2018 20:34, Roger Hayter wrote:
Gareth's Downstairs Computer
wrote:

On 05/09/2018 17:11, Spike wrote:
On 04/09/2018 21:27, Roger Hayter wrote:
Gareth's Downstairs Computer
wrote:

Is there a trick, or kink, or wrinkle, for putting in
an earth stake with the knowledge that it will go all the way
down (3 feet) into the ground without hitting an obstacle
so leaving you with a problem stake that is only half way in
but held so firmly by the soil that you cannot get it out?

A 1 metre SDS masonry drill helps. To get the old one out a pipe wrench
can be useful, and possibly a slide hammer.

In the days when I was into putting in earth stakes, I developed a
routine that tended to avoid unfortunate happenings - learned the hard
way, of course. The idea was to take a 4' solid aluminium-alloy rod,
then turn a point at one end and drill and tap a thread at the other for
a screw terminal. The next requirement was for a pint or so of soapy
water and the most powerful mains-electric drill I could find, and then
secure the terminal end of the rod in the chuck. Locate the spot where
the earth stake was to go, and scoop a small 'funnel' out of the earth,
into which the soapy water was poured. The point of the rod was then
placed in the centre of the funnel, the drill started, and using only
minimal pressure and a fairly low drill speed, press the rod into the
ground. Sometimes the rod would go in to the right depth, and sometimes
it would hit a solid obstruction. In the latter case it was important to
keep the drill rotating while easing the rod back out of the soil and
then repeating the process close by until the desired result was obtained.



Thanks, muchly.

But needs to be a pretty big lathe to turn a 4 ft rod.


Merely the usual hollow shaft through the headstock holding the chuck,
and 4 ft of space behind the headstock. (Or a temporary hole in the
wall if necessary!)


That's a neat idea; must try that!



 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
[RADARC] 53 years of Earth-Moon-Earth (EME), then and now RADARC via rec.radio.info Admin Info 0 March 3rd 17 11:51 PM
CALCULATION OF EARTH RESISTANCE IN MULTI-LAYER EARTH STRUCTURE [email protected] Antenna 2 January 12th 05 03:41 PM
CALCULATION OF EARTH RESISTANCE IN MULTI-LAYER EARTH STRUCTURE [email protected] Equipment 1 January 11th 05 05:14 PM
FS: Earth Rods and clamps MAS Equipment 0 August 26th 03 01:40 PM
FS: Earth Rods and clamps MAS Equipment 0 August 26th 03 01:40 PM


All times are GMT +1. The time now is 09:53 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright 2004-2025 RadioBanter.
The comments are property of their posters.
 

About Us

"It's about Radio"

 

Copyright © 2017