| Home |
| Search |
| Today's Posts |
|
#1
|
|||
|
|||
|
I am installing a short tower. The soil is very dry, mostly volcanic ash
and low conductivity. I had the backhoe operator dirll several holes 4 feet deep for grounding. It is impossible to drive a ground rod deeper than 4 feet due to bedrock. What should I use to fill the holes after the ground rods are installed? |
| Thread Tools | Search this Thread |
| Display Modes | |
|
|
Similar Threads
|
||||
| Thread | Forum | |||
| Another question regarding single point grounding | Antenna | |||
| Grounding the Home (PC) Computer's Frame and Power Supply ? ? ? | Shortwave | |||
| Station Grounding | Antenna | |||
| Antenna mast grounding question | Antenna | |||
| Grounding | Shortwave | |||