Home |
Search |
Today's Posts |
#27
![]() |
|||
|
|||
![]() I heard of a newly installed phone exchange generator that kept stalling when they cut it on to the load: they pulled it all apart and checked every part of the alternator and diesel motor with no success. Then one day they were trying again and these linesmen rushed in from the pub next door shouting and screaming: The grid in the area had been shut down for line repairs so the immediate city block had no electricity. They were knocking back a few coldies when they heard the roar of the generator and saw the lights in the pub flickering. It seems the techs had wired it in without relays to isolate the line input cables and were trying to power an entire city block: no wonder it was stalling. They were lucky they didn't fry a linesman too. |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
FS: sma-to-bnc custom fit rubber covered antenna adapter | Antenna | |||
Lumped Load Models v. Distributed Coils | Antenna | |||
Current in antenna loading coils controversy (*sigh*) | Antenna | |||
Smith Chart Quiz | Antenna |