Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Old August 2nd 15, 05:54 PM posted to rec.radio.amateur.antenna
external usenet poster
 
First recorded activity by RadioBanter: Jun 2007
Posts: 1,336
Default 2m antenna and Micro Inverters

On Sun, 2 Aug 2015 07:15:26 -0400, "Tom" wrote:

That is it in a nutshell. I am waiting for approval for the program, If
approved then I can go forward to begin purchasing the system and start
building it.


One more potential problem. Enphase has an online monitoring system
at:
https://enlighten.enphaseenergy.com
https://enlighten.enphaseenergy.com/public_systems
I suggest that you eventually sign up as a system owner. You can
download the data and create your own graphs such as:
http://802.11junk.com/jeffl/solar/380732/total-energy-21040613-20150213.jpg

Incidentally, you can query the Envoy controller directly either via a
web interface or using a graphing program (MRTG):
http://blog.tinle.org/?p=111
http://pvoutput.org
http://pvoutput.org/outputs.jsp
None of the system owners I deal with want me to do this, so I haven't
bothered to try it.

Now that I'm thinking about it, you might run into another problem.
The People's Republic of Santa Cruz (county) uses the NFPA NEC code
which now demands 2ft of clearance between the roof peak and the solar
panels. This clear area is for ventilating the roof should the house
catch fire. I have some issues with this requirement because it
significantly reduces the available roof area for panels for no
benefit because the other side of a typical hip roof is usually clear
of solar panels. You might want to check whether this is a
requirement in your area. I have some docs on the topic if becomes a
problem.

Good luck.

--
Jeff Liebermann
150 Felker St #D
http://www.LearnByDestroying.com
Santa Cruz CA 95060 http://802.11junk.com
Skype: JeffLiebermann AE6KS 831-336-2558
  #2   Report Post  
Old August 4th 15, 11:17 PM posted to rec.radio.amateur.antenna
external usenet poster
 
First recorded activity by RadioBanter: Sep 2012
Posts: 63
Default 2m antenna and Micro Inverters

Thank you sir for your expertise again.

Very much appreciated.

73s





"Jeff Liebermann" wrote in message
...
On Sun, 2 Aug 2015 07:15:26 -0400, "Tom" wrote:

That is it in a nutshell. I am waiting for approval for the program, If
approved then I can go forward to begin purchasing the system and start
building it.


One more potential problem. Enphase has an online monitoring system
at:
https://enlighten.enphaseenergy.com
https://enlighten.enphaseenergy.com/public_systems
I suggest that you eventually sign up as a system owner. You can
download the data and create your own graphs such as:
http://802.11junk.com/jeffl/solar/380732/total-energy-21040613-20150213.jpg

Incidentally, you can query the Envoy controller directly either via a
web interface or using a graphing program (MRTG):
http://blog.tinle.org/?p=111
http://pvoutput.org
http://pvoutput.org/outputs.jsp
None of the system owners I deal with want me to do this, so I haven't
bothered to try it.

Now that I'm thinking about it, you might run into another problem.
The People's Republic of Santa Cruz (county) uses the NFPA NEC code
which now demands 2ft of clearance between the roof peak and the solar
panels. This clear area is for ventilating the roof should the house
catch fire. I have some issues with this requirement because it
significantly reduces the available roof area for panels for no
benefit because the other side of a typical hip roof is usually clear
of solar panels. You might want to check whether this is a
requirement in your area. I have some docs on the topic if becomes a
problem.

Good luck.

--
Jeff Liebermann
150 Felker St #D
http://www.LearnByDestroying.com
Santa Cruz CA 95060 http://802.11junk.com
Skype: JeffLiebermann AE6KS 831-336-2558


  #3   Report Post  
Old August 20th 15, 08:14 PM posted to rec.radio.amateur.antenna
external usenet poster
 
First recorded activity by RadioBanter: Sep 2012
Posts: 63
Default 2m antenna and Micro Inverters

Hi Jeff

Can you comment on the fact that these Enphase converters need 240ac volts
(grid connection) to run? This means that if ever the power supplier
locally ever shuts down for more than a long period of time that these
Enphase units become useless. Around my neck of the woods we are getting
more and more power outages lasting longer and longer. These inverters
require being connected to the grid to function.

I understand the safety requirement and it needing to do this to be
certified but it really limits the home owner (or cottage owner in my case).

Have you ever worked on a system that was more practical? That qualified for
the grid program but was useful when detached from the grid? Seems to me if
ever the power company decides to cancel the program you may be stuck with
40 inverters that are useless and are 200 dollars each.

Any comments are thankful,

Regards

Tom





"Tom" wrote in message
...
Thank you sir for your expertise again.

Very much appreciated.

73s





"Jeff Liebermann" wrote in message
...
On Sun, 2 Aug 2015 07:15:26 -0400, "Tom" wrote:

That is it in a nutshell. I am waiting for approval for the program, If
approved then I can go forward to begin purchasing the system and start
building it.


One more potential problem. Enphase has an online monitoring system
at:
https://enlighten.enphaseenergy.com
https://enlighten.enphaseenergy.com/public_systems
I suggest that you eventually sign up as a system owner. You can
download the data and create your own graphs such as:
http://802.11junk.com/jeffl/solar/380732/total-energy-21040613-20150213.jpg

Incidentally, you can query the Envoy controller directly either via a
web interface or using a graphing program (MRTG):
http://blog.tinle.org/?p=111
http://pvoutput.org
http://pvoutput.org/outputs.jsp
None of the system owners I deal with want me to do this, so I haven't
bothered to try it.

Now that I'm thinking about it, you might run into another problem.
The People's Republic of Santa Cruz (county) uses the NFPA NEC code
which now demands 2ft of clearance between the roof peak and the solar
panels. This clear area is for ventilating the roof should the house
catch fire. I have some issues with this requirement because it
significantly reduces the available roof area for panels for no
benefit because the other side of a typical hip roof is usually clear
of solar panels. You might want to check whether this is a
requirement in your area. I have some docs on the topic if becomes a
problem.

Good luck.

--
Jeff Liebermann
150 Felker St #D
http://www.LearnByDestroying.com
Santa Cruz CA 95060 http://802.11junk.com
Skype: JeffLiebermann AE6KS 831-336-2558




  #4   Report Post  
Old August 20th 15, 08:28 PM posted to rec.radio.amateur.antenna
external usenet poster
 
First recorded activity by RadioBanter: Oct 2012
Posts: 1,067
Default 2m antenna and Micro Inverters

On 8/20/2015 3:14 PM, Tom wrote:
Hi Jeff

Can you comment on the fact that these Enphase converters need 240ac
volts (grid connection) to run? This means that if ever the power
supplier locally ever shuts down for more than a long period of time
that these Enphase units become useless. Around my neck of the woods we
are getting more and more power outages lasting longer and longer. These
inverters require being connected to the grid to function.

I understand the safety requirement and it needing to do this to be
certified but it really limits the home owner (or cottage owner in my
case).

Have you ever worked on a system that was more practical? That qualified
for the grid program but was useful when detached from the grid? Seems
to me if ever the power company decides to cancel the program you may be
stuck with 40 inverters that are useless and are 200 dollars each.

Any comments are thankful,

Regards

Tom


Tom,

We don't do PV installations, but I have worked with a couple of
companies who do. Most of these installations will not run unless they
can synchronize with the 60hz line voltage - that is, when power fails,
the PV system doesn't run. I know there are some out there which will
run off of batteries, but not being familiar with the systems
themselves, I can't recommend any.

One other caution. At least here on the East Coast, you need a permit
to install a PV system. In many jurisdictions the wiring must be done
by a licensed electrician, although some will allow you to do it. In
most cases, if you are going to do it, you will need to take a test on
the National Electric Code before you are allowed to proceed.

And finally, the installation must be inspected by building authorities.
Failure to do so can cause all kinds of problems.

In short, a PV installation is not a DIY project. It's very complex,
with numerous building and electric codes involved. And a bad
installation can be a serious fire and electric shock hazard.


--

==================
Remove the "x" from my email address
Jerry, AI0K

==================
  #5   Report Post  
Old August 20th 15, 09:41 PM posted to rec.radio.amateur.antenna
external usenet poster
 
First recorded activity by RadioBanter: Sep 2012
Posts: 63
Default 2m antenna and Micro Inverters

Thanks for commenting Jerry

Yes, all you say is the same here. All elements of the codes must be
followed.

So you are saying it is possible to be able to use your solar panels when
the grid is off?

At my cottage the grid shuts off for long times.

Thanks





"Jerry Stuckle" wrote in message
...
On 8/20/2015 3:14 PM, Tom wrote:
Hi Jeff

Can you comment on the fact that these Enphase converters need 240ac
volts (grid connection) to run? This means that if ever the power
supplier locally ever shuts down for more than a long period of time
that these Enphase units become useless. Around my neck of the woods we
are getting more and more power outages lasting longer and longer. These
inverters require being connected to the grid to function.

I understand the safety requirement and it needing to do this to be
certified but it really limits the home owner (or cottage owner in my
case).

Have you ever worked on a system that was more practical? That qualified
for the grid program but was useful when detached from the grid? Seems
to me if ever the power company decides to cancel the program you may be
stuck with 40 inverters that are useless and are 200 dollars each.

Any comments are thankful,

Regards

Tom


Tom,

We don't do PV installations, but I have worked with a couple of
companies who do. Most of these installations will not run unless they
can synchronize with the 60hz line voltage - that is, when power fails,
the PV system doesn't run. I know there are some out there which will
run off of batteries, but not being familiar with the systems
themselves, I can't recommend any.

One other caution. At least here on the East Coast, you need a permit
to install a PV system. In many jurisdictions the wiring must be done
by a licensed electrician, although some will allow you to do it. In
most cases, if you are going to do it, you will need to take a test on
the National Electric Code before you are allowed to proceed.

And finally, the installation must be inspected by building authorities.
Failure to do so can cause all kinds of problems.

In short, a PV installation is not a DIY project. It's very complex,
with numerous building and electric codes involved. And a bad
installation can be a serious fire and electric shock hazard.


--

==================
Remove the "x" from my email address
Jerry, AI0K

==================




  #6   Report Post  
Old August 20th 15, 10:03 PM posted to rec.radio.amateur.antenna
external usenet poster
 
First recorded activity by RadioBanter: Jun 2006
Posts: 1,898
Default 2m antenna and Micro Inverters

Tom wrote:
Thanks for commenting Jerry

Yes, all you say is the same here. All elements of the codes must be
followed.

So you are saying it is possible to be able to use your solar panels when
the grid is off?

At my cottage the grid shuts off for long times.

Thanks


Yes, it is possible, but takes more equipment.

Most PV systems take the simple approach to the requirement that they
not feed into a grid that is off and potentially electrocute a
lineman by simply turning off your system.

More expensive systems include sensors and relays to isolate your
PV system and residence from the grid if the grid turns off.



--
Jim Pennino
  #7   Report Post  
Old August 20th 15, 10:40 PM posted to rec.radio.amateur.antenna
external usenet poster
 
First recorded activity by RadioBanter: Sep 2012
Posts: 63
Default 2m antenna and Micro Inverters

Yes, but Enphase Microinverters shut off, SolarEdge inverters shut off, for
just that reason. This makes them certifiable. They are probably the better
ones for my application.

You mentioned it was possible with more equipment. Can you elaborate? I want
to primarily be on the program, but when my grid goes down for any serious
length of time what more equipment would you recommend me considering that
both meets the code, made in Ontario and is tried and true, suitable for the
program. I don't want knock offs or copies, or offshore stuff. Must be
certified and meet the code, etc etc, and not so complicated it needs NASA
Satelite Engineers to approve my drawings.


Thanks





wrote in message
...
Tom wrote:
Thanks for commenting Jerry

Yes, all you say is the same here. All elements of the codes must be
followed.

So you are saying it is possible to be able to use your solar panels when
the grid is off?

At my cottage the grid shuts off for long times.

Thanks


Yes, it is possible, but takes more equipment.

Most PV systems take the simple approach to the requirement that they
not feed into a grid that is off and potentially electrocute a
lineman by simply turning off your system.

More expensive systems include sensors and relays to isolate your
PV system and residence from the grid if the grid turns off.



--
Jim Pennino


  #8   Report Post  
Old August 21st 15, 02:54 AM posted to rec.radio.amateur.antenna
external usenet poster
 
First recorded activity by RadioBanter: Jun 2007
Posts: 1,336
Default 2m antenna and Micro Inverters

On Thu, 20 Aug 2015 15:14:46 -0400, "Tom" wrote:

Can you comment on the fact that these Enphase converters need 240ac volts
(grid connection) to run? This means that if ever the power supplier
locally ever shuts down for more than a long period of time that these
Enphase units become useless. Around my neck of the woods we are getting
more and more power outages lasting longer and longer. These inverters
require being connected to the grid to function.


Yep, been there. Almost everyone that has a grid tied solar system
wants to know what it will take to make it run when the power is down.
Home Power Magazine had a nice article on the topic in the current
issue (168):
http://www.homepower.com/articles/solar-electricity/design-installation/adding-battery-backup-your-pv-system-ac-coupling
The magic buzzword for Googling is "AC-Coupled Battery Backup PV
System" (or something like that). Note that there are both DC and AC
coupled approaches to the problem, each with their own advantages and
problems.

Note that Elon Musk wants to do much the same thing but not to backup
your solar PV system. He wants to store excess power in a battery
bank, and return it during times of peak loads to save money using
time of use billing.
http://www.wired.com/2015/05/teslas-batteries-will-power-home/

I understand the safety requirement and it needing to do this to be
certified but it really limits the home owner (or cottage owner in my case).


Yep. All of the stuff in the article is probably approved, but I
would be careful and check, especially with made in China hardware
purchased on eBay.

Have you ever worked on a system that was more practical?


More practical than what? I've done nothing with AC coupled backup
systems for grid tied PV systems, mostly because none of my customers
will tolerate the cost. It's often cheaper to just buy a big
generator and let it sit around until it's needed. Diesel seems to be
the favorite.

That qualified for
the grid program but was useful when detached from the grid? Seems to me if
ever the power company decides to cancel the program you may be stuck with
40 inverters that are useless and are 200 dollars each.


You're mixing up a bunch of programs. First, your power company is
unlikely to pull the plug except for non-payment. It might decide to
cancel subsidies or refuse to offer net metering payments, as happens
in many states. In California, if the power is lost for extended
periods, there is some fixed amount that the power companies are
required to refund the customer on their next bill. That too might be
terminated. At this time, power generation and distribution is mostly
a "best effort" exercise, with little in the way of guarantees
covering extended outages.

If you're dependent on a sole source of power, such as utility *OR*
PV, then you'll have the same problem with outages. My best
suggestions is to have more than one source of power. Utility and PV
are the most common. There's also wind and micro-hydro generation.
Batteries don't generate electricity so they're not considered an
alternative power source. Once you have your power source in place,
then you can think about storage options.

Any comments are thankful,


If you wanted to be off the grid, then kindly plan your system for off
grid use. That mostly eliminates grid tied systems and always
requires batteries or other forms of energy storage (maybe flywheel).
Instead of micro-inverters, you're back to the big charger/controller
boxes, and banks of batteries.

Batteries are always a problem. They require constant care. They
tend to die rather quickly. They're expensive. They're big, ugly,
and dangerous. They're far too easy to kill. Before dealing with
batteries, make sure you know what you're getting into.

--
Jeff Liebermann
150 Felker St #D
http://www.LearnByDestroying.com
Santa Cruz CA 95060 http://802.11junk.com
Skype: JeffLiebermann AE6KS 831-336-2558
  #9   Report Post  
Old August 21st 15, 02:00 PM posted to rec.radio.amateur.antenna
external usenet poster
 
First recorded activity by RadioBanter: Sep 2012
Posts: 63
Default 2m antenna and Micro Inverters

Thanks gents

Great, thanks for all your thoughts.

I wanted to stay away from the battery bank thing, I have enough trouble
with keeping 4 or 5 deep cycles alive for more than 5 or 6 years. But I may
introduce them to a PV system.
But all my Deep Cycles are different sizes, so sure would like some of those
Tesla by Elon. I believe that person is developing a huge PV manufacturing
facility in Buffalo NY but I talked to SolarCity reps and they will not deal
with Canadian market.

My program is with Ontario Hydro and up north our local providers are shaky
and unreliable. In Ontario Canada the provincial govt is recently (last
decade or more) really screwed things up, they started a Gas Power Plant and
cancelled that after about a billion, they have had other programs that they
started and abruptly ended after loosing a few billion and now they are in a
50 year debt and trying to sell off to private (fire sale) and they are
offering this program to me for a 20 year contract. So I must install 40
panels on my roof and tie it all into the grid and they want 100% of it and
paying a pretty nice penny per KWh. But the initial investment by me is
substantial up front so if they pull out of the deal in one year then I have
a very big expensive inverters that are good for nothing. A lot of people in
Ontario Canada don't think that the local Ontary Hydro will be long for this
world, so we don't want to get stuck on this program and left hanging.

I can see them keeping me (and all home owners or cottage owners) as
providers because we aren't unionized and costing more to produce it than
selling it, I think they are trying to eliminate the nuclear (60% of our
power in Ontario) because it is costing too much debt. So their goal may be
to get all that can to provide it because I maintain the house structure and
panel system and no union or salary or coffee breaks. But they could cancel
that tomorrow leaving me a $30,000 system I can do nothing with.

I like what they are offering, it seems too good to be true.

I will take a chance, role the dice and jump in. For the program. Without
the program it isn't worth it at this time.

Thanks very much for all the food for thought, I will implement a small
charge controller and small battery bank system. I like your Diesel
Generator idea for if ever the power does go out, which it does. But it is
small to worry about. Thanks again for all the ideas.

For my primary reason for this system, I will buy the 40 panels and do you
folks have any reasons why you would select the Solaredge technology with
the new optimizers for efficiencies (about $3000.00) for their product, or
using Enphase microinverters (about $7000.00). Other than costs difference,
which would you folks prefer? Both become useless if the power grid goes
off, but both are looking pretty equal for efficiences and installation is
easy enough.

All the surfing and reading I see is everyone has installed the Solaredge
and it seems to have improved nicely, while the Enphase is the lastest and
not really had many years of use to compare, but they apparently to some are
the better device.

Do you folks have any comments on either of these devices?

Have good day, thanks







"Jeff Liebermann" wrote in message
...
On Thu, 20 Aug 2015 15:14:46 -0400, "Tom" wrote:

Can you comment on the fact that these Enphase converters need 240ac volts
(grid connection) to run? This means that if ever the power supplier
locally ever shuts down for more than a long period of time that these
Enphase units become useless. Around my neck of the woods we are getting
more and more power outages lasting longer and longer. These inverters
require being connected to the grid to function.


Yep, been there. Almost everyone that has a grid tied solar system
wants to know what it will take to make it run when the power is down.
Home Power Magazine had a nice article on the topic in the current
issue (168):
http://www.homepower.com/articles/solar-electricity/design-installation/adding-battery-backup-your-pv-system-ac-coupling
The magic buzzword for Googling is "AC-Coupled Battery Backup PV
System" (or something like that). Note that there are both DC and AC
coupled approaches to the problem, each with their own advantages and
problems.

Note that Elon Musk wants to do much the same thing but not to backup
your solar PV system. He wants to store excess power in a battery
bank, and return it during times of peak loads to save money using
time of use billing.
http://www.wired.com/2015/05/teslas-batteries-will-power-home/

I understand the safety requirement and it needing to do this to be
certified but it really limits the home owner (or cottage owner in my
case).


Yep. All of the stuff in the article is probably approved, but I
would be careful and check, especially with made in China hardware
purchased on eBay.

Have you ever worked on a system that was more practical?


More practical than what? I've done nothing with AC coupled backup
systems for grid tied PV systems, mostly because none of my customers
will tolerate the cost. It's often cheaper to just buy a big
generator and let it sit around until it's needed. Diesel seems to be
the favorite.

That qualified for
the grid program but was useful when detached from the grid? Seems to me
if
ever the power company decides to cancel the program you may be stuck with
40 inverters that are useless and are 200 dollars each.


You're mixing up a bunch of programs. First, your power company is
unlikely to pull the plug except for non-payment. It might decide to
cancel subsidies or refuse to offer net metering payments, as happens
in many states. In California, if the power is lost for extended
periods, there is some fixed amount that the power companies are
required to refund the customer on their next bill. That too might be
terminated. At this time, power generation and distribution is mostly
a "best effort" exercise, with little in the way of guarantees
covering extended outages.

If you're dependent on a sole source of power, such as utility *OR*
PV, then you'll have the same problem with outages. My best
suggestions is to have more than one source of power. Utility and PV
are the most common. There's also wind and micro-hydro generation.
Batteries don't generate electricity so they're not considered an
alternative power source. Once you have your power source in place,
then you can think about storage options.

Any comments are thankful,


If you wanted to be off the grid, then kindly plan your system for off
grid use. That mostly eliminates grid tied systems and always
requires batteries or other forms of energy storage (maybe flywheel).
Instead of micro-inverters, you're back to the big charger/controller
boxes, and banks of batteries.

Batteries are always a problem. They require constant care. They
tend to die rather quickly. They're expensive. They're big, ugly,
and dangerous. They're far too easy to kill. Before dealing with
batteries, make sure you know what you're getting into.

--
Jeff Liebermann
150 Felker St #D
http://www.LearnByDestroying.com
Santa Cruz CA 95060 http://802.11junk.com
Skype: JeffLiebermann AE6KS 831-336-2558


  #10   Report Post  
Old August 21st 15, 02:56 PM posted to rec.radio.amateur.antenna
external usenet poster
 
First recorded activity by RadioBanter: Oct 2012
Posts: 1,067
Default 2m antenna and Micro Inverters

On 8/21/2015 9:00 AM, Tom wrote:
Thanks gents

Great, thanks for all your thoughts.

I wanted to stay away from the battery bank thing, I have enough trouble
with keeping 4 or 5 deep cycles alive for more than 5 or 6 years. But I
may introduce them to a PV system.
But all my Deep Cycles are different sizes, so sure would like some of
those Tesla by Elon. I believe that person is developing a huge PV
manufacturing facility in Buffalo NY but I talked to SolarCity reps and
they will not deal with Canadian market.

My program is with Ontario Hydro and up north our local providers are
shaky and unreliable. In Ontario Canada the provincial govt is recently
(last decade or more) really screwed things up, they started a Gas Power
Plant and cancelled that after about a billion, they have had other
programs that they started and abruptly ended after loosing a few
billion and now they are in a 50 year debt and trying to sell off to
private (fire sale) and they are offering this program to me for a 20
year contract. So I must install 40 panels on my roof and tie it all
into the grid and they want 100% of it and paying a pretty nice penny
per KWh. But the initial investment by me is substantial up front so if
they pull out of the deal in one year then I have a very big expensive
inverters that are good for nothing. A lot of people in Ontario Canada
don't think that the local Ontary Hydro will be long for this world, so
we don't want to get stuck on this program and left hanging.

I can see them keeping me (and all home owners or cottage owners) as
providers because we aren't unionized and costing more to produce it
than selling it, I think they are trying to eliminate the nuclear (60%
of our power in Ontario) because it is costing too much debt. So their
goal may be to get all that can to provide it because I maintain the
house structure and panel system and no union or salary or coffee
breaks. But they could cancel that tomorrow leaving me a $30,000 system
I can do nothing with.

I like what they are offering, it seems too good to be true.

I will take a chance, role the dice and jump in. For the program.
Without the program it isn't worth it at this time.

Thanks very much for all the food for thought, I will implement a small
charge controller and small battery bank system. I like your Diesel
Generator idea for if ever the power does go out, which it does. But it
is small to worry about. Thanks again for all the ideas.

For my primary reason for this system, I will buy the 40 panels and do
you folks have any reasons why you would select the Solaredge technology
with the new optimizers for efficiencies (about $3000.00) for their
product, or using Enphase microinverters (about $7000.00). Other than
costs difference, which would you folks prefer? Both become useless if
the power grid goes off, but both are looking pretty equal for
efficiences and installation is easy enough.

All the surfing and reading I see is everyone has installed the
Solaredge and it seems to have improved nicely, while the Enphase is the
lastest and not really had many years of use to compare, but they
apparently to some are the better device.

Do you folks have any comments on either of these devices?

Have good day, thanks


You're going to be better off asking questions like this in a solar
power related group. I don't think anyone here has any detailed
experience with what you're asking.

--
==================
Remove the "x" from my email address
Jerry, AI0K

==================


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Need Info: Pure Sine Wave Inverters and Radio Noise Rick (W-A-one-R-K-T) Equipment 1 November 9th 07 07:13 PM
micro--waves ml Antenna 4 July 15th 07 12:32 PM
Inverters Allen McCann Swap 1 April 29th 05 01:59 PM
New micro TNC, anyone got one? David Hubbell Digital 0 July 2nd 04 05:05 PM
New micro TNC, anyone got one? David Hubbell Digital 0 July 2nd 04 05:05 PM


All times are GMT +1. The time now is 03:14 AM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 RadioBanter.
The comments are property of their posters.
 

About Us

"It's about Radio"

 

Copyright © 2017