Home |
Search |
Today's Posts |
#1
|
|||
|
|||
Tower rates
Looking for info on the going rate for tower work. (ie. light bulb
changeouts, coax runs, etc.) Is it usually by the hour, by the foot, or both? Thanks |
#2
|
|||
|
|||
Both. There was a fairly inclusive thread on this a couple of weeks ago.
Do a Google Groups search. I contributed, use tower and my handle, and june and july. -- Crazy George Remove NO and SPAM from return address "Bressler Communications" wrote in message . .. Looking for info on the going rate for tower work. (ie. light bulb changeouts, coax runs, etc.) Is it usually by the hour, by the foot, or both? Thanks |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Want manual and/or engineering specs for Tristao MA-550 tubular tower | Antenna |