Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
Old July 17th 03, 03:19 AM
Bressler Communications
 
Posts: n/a
Default Tower rates

Looking for info on the going rate for tower work. (ie. light bulb
changeouts, coax runs, etc.) Is it usually by the hour, by the foot, or
both?

Thanks



  #2   Report Post  
Old July 18th 03, 04:57 AM
Crazy George
 
Posts: n/a
Default

Both. There was a fairly inclusive thread on this a couple of weeks ago.
Do a Google Groups search. I contributed, use tower and my handle, and june
and july.

--
Crazy George
Remove NO and SPAM from return address
"Bressler Communications" wrote in message
. ..
Looking for info on the going rate for tower work. (ie. light bulb
changeouts, coax runs, etc.) Is it usually by the hour, by the foot, or
both?

Thanks





Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Want manual and/or engineering specs for Tristao MA-550 tubular tower Michael Herron Antenna 0 July 11th 03 08:17 AM


All times are GMT +1. The time now is 01:22 PM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 RadioBanter.
The comments are property of their posters.
 

About Us

"It's about Radio"

 

Copyright © 2017