Home |
Search |
Today's Posts |
#11
![]() |
|||
|
|||
![]()
On 26 Jul 2003 04:49:22 GMT, Alun Palmer wrote:
OK Phil, read 97.301(e) and let us know how you understand it, parsing each part carefully. OK - I presume that you mean the following text, not the frequency table: (e) For a station having a control operator who has been granted an operator license of Novice Class or Technician Class This is self-explanatory. and who has received credit for proficiency in telegraphy in accordance with the international requirements. The key to this discussion is, or course, "what are the international requirements". Up until the 2003 revision of S25.5 of the IRR, each Administration was required to determine the proficiency of each applicant for a license valid for operation below 30 MHz. In the US, this was done by requiring the applicant to pass Element 1. Upon the 2003 revision of S25.5 of the IRR, the requirement to determine proficiency was made optional for each Administration. That is the only change in the "international requirement" - each Administration can now decide by its own rules/regulations whether to require a code test. The code test is no longer mandatory for each Administration. Each Administration's requirement for code testing has not been automatically "dropped" or "eliminated" solely by the revision of S25.5. Until the FCC changes the rules concering Element 1, the requirement in the US remains that Element 1 must be passed. The question of -when- and -how- the FCC Rules will be changed is a separate item from -what- the rule requirement is up until they -are- changed. Ditto for how the FCC will handle the issue of giving -what- privileges to folks who hold a Technician license but have never passed the code test. Does that answer your question? -- 73 de K2ASP - Phil Kane ARRL Volunteer Counsel From a Clearing in the Silicon Forest Beaverton (Washington County) Oregon |