LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #11   Report Post  
Old October 10th 03, 04:34 AM
Tarmo Tammaru
 
Posts: n/a
Default

Tom,

I am making progress with the SWCad model of the power meter. The current to
voltage converter is working, which should be the hardest part. What I like
about doing it this way is that all components have 0 tolerance, and there
is nothing in the circuit that I don't put on the schematic. Unfortunately,
I won't be able to do anything the next couple of days.

Tam/WB2TT


 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Re-Normalizing the Smith Chart (Changing the SWR into the Richard Harrison Antenna 58 September 3rd 03 04:49 AM
Re-Normalizing the Smith Chart (Changing the SWR into thesame... Richard Harrison Antenna 99 August 30th 03 06:26 PM
Re-Normalizing the Smith Chart (Changing the SWR into the same load) Dr. Slick Antenna 98 August 30th 03 03:09 AM
Re-Normalizing the Smith Chart (Changing the SWR intothesame... Richard Harrison Antenna 7 August 24th 03 01:45 AM
Length of Coax Affecting Incident Power to Meter? Dr. Slick Antenna 140 August 18th 03 08:17 PM


All times are GMT +1. The time now is 01:48 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 RadioBanter.
The comments are property of their posters.
 

About Us

"It's about Radio"

 

Copyright © 2017