| Home |
| Search |
| Today's Posts |
|
#7
|
|||
|
|||
|
In rec.radio.swap yea right wrote:
If you have not already, please file a comment with the FCC. It only takes a few minutes. We have until June 22nd Brief instructions at www.vambo.org/a Brief -- and wrong. 03-104 is last year's proceeding. The correct proceeding is 04-37. 03-104 has been closed for A Long Time. Also, present rules do allow BPL to be deployed. BPL under present rules interferes with HF communications, as I stated in my filing in the current proceeding. The FCC seeks now to promulgate BPL-specific rules. That is the intent of the current proceeding. -- To design the perfect anti-Unix, write an operating system that thinks it knows what you're doing better than you do. And then adds injury to insult by getting it wrong. - esr |
| Thread Tools | Search this Thread |
| Display Modes | |
|
|