Home |
Search |
Today's Posts |
#8
![]() |
|||
|
|||
![]()
Thank you all for your responses. I definitely need to review the best
approach. I've gone through a lot to put this tower up and don't need to have a weak link in the system. I'll look into getting conduit that meets electrical code for Alberta. As far a critters are concerned, I have field & deer mice along with voles so to keep this little buggers out, this is the best way to tackle the job. I do have an electrician coming to my home for other upgrades and just may have him work on the conduit piping, too. Time is against me as I have approximately 6 weeks before the ground freezes. Oh yes, I have about 2 feet of beautiful Alberta topsoil before I hit clay. I'll keep the newsgroup up to date with my progress. Once again, I thank everyone for their ideas. 73 de Mike VE6HMG |
Thread Tools | Search this Thread |
Display Modes | |
|
|
![]() |
||||
Thread | Forum | |||
Burying coax idea | Antenna | |||
SyntorX9000 cables only, no control head | Swap | |||
Coax Burying ? | Shortwave | |||
WTB MARATRAC CONTROL CABLES & HEADS | Swap | |||
Burying Coax | Antenna |