LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #8   Report Post  
Old December 22nd 03, 03:37 AM
Crazy George
 
Posts: n/a
Default

Clint:

When you pour the cement and put the crown on the top, make it at least
3/4"-1" higher in the center as it will probably drop some in the center as
it cures. This is why so much "professional" cement flat work holds water
in the middle. No one teaches the proper method of cement installation any
longer.

--
Crazy George


 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Rohn Tower help Fred E. Lux Antenna 4 December 20th 03 09:46 PM
Rohn 45 Bill Antenna 5 October 26th 03 05:15 PM
AC978 Tower for Sale Me Antenna 0 October 7th 03 03:23 AM
EZ Way tower sheared hinge pin conclusion(?) Dan Lanciani Antenna 5 September 1st 03 07:03 PM
EZ Way tower sheared hinge pin Dan Lanciani Antenna 3 August 11th 03 10:21 PM


All times are GMT +1. The time now is 05:40 PM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 RadioBanter.
The comments are property of their posters.
 

About Us

"It's about Radio"

 

Copyright © 2017