Home |
Search |
Today's Posts |
#8
![]() |
|||
|
|||
![]()
"Jim Hampton" wrote in
: Please re-read Phil's reply again. You missed the point as to each administration is free to do as they please. So far, the FCC has not seen to eliminate the Morse requirement. Period. 73 from Rochester, NY Jim --- Outgoing mail is certified Virus Free. Checked by AVG anti-virus system (http://www.grisoft.com). Version: 6.0.504 / Virus Database: 302 - Release Date: 7/24/03 No I am well aware of that point. However, the FCCs implementation of requiring a code test is different for Techs than it is for Generals and Extras. Generals and Extras are required to pass Element 1, and Techs are not. Access for Techs to the Novice HF subbands is __not__ conditioned on passing Element 1, but only upon having "received credit for proficiency in telegraphy in accordance with the international requirements" (from rule 97.301(e)). Given that s25.5 leaves it open for each administration to determine if a code test is required, with no mention of any specific frequencies, the only rule the FCC chooses to make for Tech HF access is 97.301(e), which in turn includes the words "in accordance with international requirements", i.e. in accordance with s25.5. So, the FCC rule implies that a code test is required if s25.5 requires it, and s25.5 says that a code test is required if the administration (the FCC) requires it! This is a circular process, in fact one that could go around in ever decreasing circles! Each rule appears to be conditional upon the other! Obviously those who drafted the rules did not intend this, but the ITU rule has changed in a way that was not anticipated. It would seem to me that if two rules each require that a specific condition must be met only if the other rule requires it, then in fact that condition does not have to be met. |
Thread Tools | Search this Thread |
Display Modes | |
|
|