LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #12   Report Post  
Old September 4th 05, 04:12 AM
 
Posts: n/a
Default

Pumping will now begin at the 17th Street Canal locatin.The guy on WWL
said they are going to pump their tails off! They are going to check
that Levee from stem to stern and they are going to fix what needs
fixing.They are going to get that water down and out of New Orleans.
cuhulin

 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
SUPER J-POLE BEATS YAGI BY 1 dB [email protected] Antenna 76 February 10th 05 07:14 AM
Here's a 30KW Linear Amp in a Truck Leland C. Scott CB 66 October 16th 04 07:27 AM
GE Superadios for Dummies [ GE Super Radios I - II - III ] RHF Shortwave 9 March 22nd 04 09:37 AM
GE Superadio III earphone difficulty - and what is OHM rating Ronald Shortwave 49 January 22nd 04 07:04 PM


All times are GMT +1. The time now is 09:37 AM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 RadioBanter.
The comments are property of their posters.
 

About Us

"It's about Radio"

 

Copyright © 2017