LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #9   Report Post  
Old December 22nd 03, 02:40 PM
Wes Stewart
 
Posts: n/a
Default

On Sun, 21 Dec 2003 21:37:36 -0600, "Crazy George"
wrote:

|Clint:
|
|When you pour the cement and put the crown on the top, make it at least
|3/4"-1" higher in the center as it will probably drop some in the center as
|it cures. This is why so much "professional" cement flat work holds water
|in the middle. No one teaches the proper method of cement installation any
|longer.

Sorry George, I can't help myself.g

"Cement" is the stuff that holds the aggregate in "concrete" together
and concrete is "placed," not "poured".


 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Rohn Tower help Fred E. Lux Antenna 4 December 20th 03 10:46 PM
Rohn 45 Bill Antenna 5 October 26th 03 06:15 PM
AC978 Tower for Sale Me Antenna 0 October 7th 03 04:23 AM
EZ Way tower sheared hinge pin conclusion(?) Dan Lanciani Antenna 5 September 1st 03 08:03 PM
EZ Way tower sheared hinge pin Dan Lanciani Antenna 3 August 11th 03 11:21 PM


All times are GMT +1. The time now is 09:22 AM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 RadioBanter.
The comments are property of their posters.
 

About Us

"It's about Radio"

 

Copyright © 2017