| Home |
| Search |
| Today's Posts |
|
#9
|
|||
|
|||
|
On Sun, 21 Dec 2003 21:37:36 -0600, "Crazy George"
wrote: |Clint: | |When you pour the cement and put the crown on the top, make it at least |3/4"-1" higher in the center as it will probably drop some in the center as |it cures. This is why so much "professional" cement flat work holds water |in the middle. No one teaches the proper method of cement installation any |longer. Sorry George, I can't help myself.g "Cement" is the stuff that holds the aggregate in "concrete" together and concrete is "placed," not "poured". |
| Thread Tools | Search this Thread |
| Display Modes | |
|
|
Similar Threads
|
||||
| Thread | Forum | |||
| Rohn Tower help | Antenna | |||
| Rohn 45 | Antenna | |||
| AC978 Tower for Sale | Antenna | |||
| EZ Way tower sheared hinge pin conclusion(?) | Antenna | |||
| EZ Way tower sheared hinge pin | Antenna | |||