Home |
Search |
Today's Posts |
#11
![]() |
|||
|
|||
![]()
On Mon, 28 Jul 2003 00:52:54 GMT, "Phil Kane"
wrote: Until the FCC changes the rules concering Element 1, the requirement in the US remains that Element 1 must be passed. That is NOT what 97.301(e) says. 97.301(e) does not require a tech to possess element 1, it requires the tech licensee to meet the international standards set down in s25.5 to transmit on HF. The reason 97.301(e) was written that way is because the FCC expected the s25.5 reference to be deleted, but it was changed. The fact that it was changed does not mean a tech licensee is not meeting the requirements set down in 97.301(e). It doesn't mean a tech can get on 20 meters, it should mean he can operate on HF in the allocated tech bands according to the FCC rules. -- The Radio Page Ham, Police Scanner, Shortwave and more. http://www.kilowatt-radio.org/ |
Thread Tools | Search this Thread |
Display Modes | |
|
|